1.1    .................... moves to amend H. F. No. 571 as follows:
1.2Page 1, line 19, delete "obtained" and insert "determined"
1.3Page 1, line 20, delete "method of procurement" and insert "procurement method"
1.4and after "price" insert ", the vendor's or contractor's ability to assess and minimize
1.5foreseeable and unforeseeable risks," and delete "including" and insert "which may
1.6include, but are not limited to"
1.7Page 1, line 24, delete "and"
1.8Page 1, delete lines 25 and 26 and insert:
1.9    "(4) the vendor's or contractor's record of performing previous projects on budget
1.10and ability to minimize cost overruns;
1.11    (5) the vendor's or contractor's ability to minimize change orders;
1.12    (6) the vendor's or contractor's ability to prepare appropriate project plans;
1.13    (7) the vendor's or contractor's technical capacities; and
1.14    (8) the individual qualifications of the contractor's key personnel.
1.15    This subdivision does not apply to sections 16C.32, 16C.33, 16C.34, and 16C.35."
1.16Page 3, line 1, delete "(b)" and insert "(a), clause (2)"
1.17Page 3, line 23, delete "(b)" and insert "(a), clause (2)"
1.18Page 4, line 2, delete "(b)" and insert "(a), clause (2)"
1.19Page 4, line 11, delete "(b)" and insert "(a), clause (2)"
1.20Page 4, line 16, delete "(b)" and insert "(a), clause (2)"
1.21Page 8, line 10, after "construction," insert "building," and after "alteration," insert
1.22"improvement, or" and delete ", or maintenance"
1.23Page 8, line 11, delete "work"
1.24Page 8, line 22, delete "design-built" and insert "design-build"
1.25Page 9, line 24, after "construction," insert "building," and after "alteration," insert
1.26"improvement, or" and delete ", or maintenance"
1.27Page 9, line 25, delete "work"
2.1Page 10, line 14, delete "commissioner" and insert "commission"
2.2Page 10, line 20, after "construction," insert "building,"
2.3Page 10, line 21, after "alteration," insert "improvement, or" and delete ", or
2.4maintenance work"
2.5Page 11, line 9, after "construction," insert "building," and after "alteration," insert
2.6"improvement, or" and delete ", or maintenance"
2.7Page 11, line 10, delete "work"
2.8Page 11, delete section 30
2.9Page 12, line 28, reinstate the stricken "shall"
2.10Page 12, line 29, delete "may"
2.11Renumber the sections in sequence and correct the internal references
2.12Amend the title accordingly